Heavy Lifting Solutions: 150T Crawler Crane Supports Mauban Jetty Port Construction

The Jetty Port construction project in Mauban, Quezon, is being carried out for ACEN (formerly AC Energy) to support their Isla Wind Farm initiative, which aims to establish a wind farm in the area. As a partner of Prime Metro BMD Corporation (PrimeBMD), the company primarily responsible for the Jetty Port construction, Mayon Machinery (MMRI) takes pride in our contribution to delivering exceptional heavy lifting solutions that support renewable energy development in the Philippines, particularly during the construction process. To ensure seamless operations and overcome various site challenges, a 150T Kobelco 7150 crawler crane was deployed to provide the necessary lifting capacity and support.

150T Kobelco 7150 Crawler Crane Supports Mauban Jetty Port Project
Challenges:
  • Difficult Transportation to Site:

Transporting the crane itself to the construction site presents a major hurdle. The narrow, mountainous terrain, steep slopes, and potentially poor road conditions significantly complicated the logistics. Specialized transport vehicles and meticulous route planning were applied to navigate these obstacles safely and efficiently.

  • Coastal Location and Unstable Ground:

The jetty’s coastal location introduced additional complexities. The ground near the sea was likely unstable, requiring careful consideration of soil conditions and potential ground shifting. This instability affected the crane’s positioning and the overall stability of the construction process.

To effectively manage these risks, the project team implemented several strategies:

  • Robust Site Assessments: Daily evaluations of site conditions ensured that the team was aware of any changes in terrain stability or weather patterns that could jeopardize safety.
  • Adherence to Safety Protocols: The use of a comprehensive safety plan, including personal protective equipment (PPE) and guidelines for safe crane operation, was paramount. Workers were trained to recognize and respond to potential hazards, particularly in unstable areas.
  • Collaboration with Experts: Working alongside geotechnical engineers and local authorities, the construction team ensured that all operations complied with safety regulations, focusing on protecting workers and equipment throughout the project.
The Kobelco 7150 – A Solution for Challenging Conditions:
  • Exceptional Lifting Capacity: The crane’s impressive lifting capacity of 150 tons allowed for the efficient handling of heavy components, accelerating the construction process.
  • Superior Stability: The crawler base provided unmatched stability on uneven terrain, minimizing the risk of accidents and ensuring the safety of both personnel and equipment.
  • Precise Control: The crane’s advanced controls allowed for the accurate placement of components, crucial for maintaining the structural integrity of the jetty.
Conclusion:

The successful completion of the Mauban Jetty Port’s construction will highlight the importance of choosing the right heavy-lifting equipment for challenging environments. Our 150T Kobelco 7150 crawler crane not only delivered the necessary power and precision but also played a pivotal role in mitigating the inherent risks associated with the project’s location. Trust MMRI to support your success from small to large-scale infrastructure projects throughout the Philippines.