200tons All Terrain Crane For Rent At Coal-Fired Power Plant In Calaca, Batangas

There are 28 coal-fired power plants currently operating throughout the Philippines, with a total installed capacity of 9.88 gigawatts. South Luzon Thermal Energy Corporation (SLTEC) is a wholly-owned subsidiary of AC Energy Corporation (ACEN) that owns and operates a 244MW coal-fired power plant in Calaca, Batangas, bringing additional power supply to the Luzon grid.

Coal-Fired Power Plant in Calaca, Batangas

Lifting of air preheater for SLTEC in Calaca, Batangas by using Mayon Machinery’s Kato KA-2000 200tons All Terrain Crane:

Kato KA-2000 200tons All Terrain Crane
Coal-Fired Power Plant In Calaca, Batangas

200tons All Terrain Crane Kato KA-2000 for rent with lifting capacity up to 200t is perfect to use at large projects highly adaptable for a variety of situations such as the installation of oil and gas pipelines, the erection of wind turbines, the lifting of heavy pre-cast concrete building segments and other construction and heavy haulage applications. Its wheel tires system provides superior off-road mobility around workplaces and is even able to be driven on the asphalt roads and highways compared with crawler cranes.

General specifications of All Terrain Crane Kato KA – 2000:

No need to worry about your heavy lifting activities, you can rely on Mayon. We offer various heavy equipment for rentals that will surely suit your lifting needs safely and properly with trained and certified operators.


For more details, please contact:

MAYON MACHINERY RENTRADE, INC – SALES & RENTAL

Tel: +63 (2) 776 0254

Email: info@mayonmachinery.com/ sales@mayonmachinery.com

Leave Your Comment